PE-Steel Transition Straight Pipe

PE/Steel Transition Pipe for Gas & Water Systems | Reliable Joint

Short Description

The PE/Steel Transition Pipe is specifically engineered for secure and long-lasting connections between polyethylene pipelines and steel pipeline networks. This transition pipe combines a PE section and a carbon steel section through a reliable bonding process, ensuring strength, leak-tight performance, and stability in demanding gas and water transmission systems.

Key Features

  • Excellent corrosion resistance, suitable for buried installation and harshenvironments
  • Smooth PE interior for low flow resistance
  • Reliable steel end for threaded or welded connections
  • Suitable for natural gas, potable water, industrial fluids, and multi-utility pipeline projects
  • Manufactured under strict standards to ensure long-term stability

Applications

PE/Steel Transition Pipes are suitable for:

  • Gas distribution networks
  • Potable water supply systems
  • Industrial fluid transportation
  • Mining and irrigation projects

It is widely used where pipelines shift from underground HDPE lines to above-ground steel pipelines or equipment connections.

How It Works

The transition pipe connects HDPE and steel pipelines through a bonded interface that prevents pullout or separation. The steel end can be welded or threaded to existing metal pipelines, while the PE end connects to HDPE pipes through:

  • Electrofusion fittings
  • Butt fusion welding
  • Mechanical fittings (optional)

This design ensures a stable, corrosion-resistant and long-lasting connection.

Why Choose Xinda Plastic Pipe Co., Ltd PE/スチール移行継手シリーズ

  • Over 24 years of HDPE fittings manufacturing experience.
  • Complete product lines:Electrofusion Fitting Series、PE/Steel Transition Fitting Series、Socket Joint Series、Butt Fusion Fitting Series.
  • High-precision copper wire embedding for consistent welding quality.
  • In-house QC lab ensures every fitting is inspected and batch-traced.
  • Comprehensive support for OEM and project supply.
  • Technical team provides fusion guidance and project support.
  • The transition joint is permanently bonded between the PE and steel ends, providing a solid, maintenance-free
  • Each fitting undergoes strict pressure and leak tests to guarantee zero leakage and high sealing reliability under operating pressure.
  • PE material resists corrosion, while the steel end is coated or galvanized for long-term durability, even in harsh environments.
  • Suitable for gas distribution, water supply networks, petrochemical industries, and industrial pipelines requiring mixed-material transitions.
  • The PE end connects easily by butt fusion or electrofusion, while the steel end connects by welding or threading, fitting diverse system designs.
Packing MethodCarton
Trading MethodEXW, FOB, CFR, CIF, DDU
Payment MethodT/T, L/C at sight
Supply Ability100000 Ton/Year
CertificateISO、CE、GB/EN12201、EN1555、KS
Production Lead TimeDepending on the order quantity.Normally about 2~3 weeks for 20′ GP, 3~4 Weeks for a 40′GP.

SpecificationsPE фdnSteel Pipe
OD
LABSteel Pipe
Inches
Pipe BoreItem Number
20x222022380662501/2"15XDGGS-20/22
25x222522410952501/2"15XDGGS-25/22
25x272527410952503/4"20XDGGS-25/27
32x2232224201112501/2"15XDGGS-32/22
32x2732274201112503/4"20XDGGS-32/27
32x3432344301122501"25XDGGS-32/34
40x3440344301122501"25XDGGS-40/34
40x384038430112250-30XDGGS-40/38
40x4240424301122501-1/4"32XDGGS-40/42
40x4840484301122501-1/2"40XDGGS-40/48
50x3450344351182501"25XDGGS-50/34
50x4250424351182501-1/4"30XDGGS-50/42
50x455045435118250-XDGGS-50/45
50x4850484301182501-1/2"40XDGGS-50/48
63x346334440126250125XDGGS-63/34
63x4263424401262501-1/4"32XDGGS-63/42
63x4863484401262501-1/2"40XDGGS-63/48
63x5763574401262502"50XDGGS-63/57
63x6063604401262502"50XDGGS-63/60
75x7675764401002502-1/2"65XDGGS-75/76
90x7690765001602502-1/2"65XDGGS-90/76
90x8990894601402503"80XDGGS-90/89
110x89110894401202503"80XDGGS-110/89
110x1081101084601402504"100XDGGS-110/108
160x1591601595201502506"150XDGGS-160/159
200x2192002196201503508"200XDGGS-200/219
250x27325027368019035010”250XDGGS-250/273
315x32531532568019035012300XDGGS-315/325
355x37535537770020035014"350XDGGS-355/375
400x40640040673023035016"400XDGGS-400/406
400x42640042673023035016"400XDGGS-400/426

Q1: What is a PE/Steel Transition Pipe used for?
A1:It is used to connect HDPE pipes to steel pipes securely in gas, water and industrial networks.

Q2:.How to buy the product?
A2:Contact with us by email or by Trade Manager or wechate/whatsapp, and inform us all information what you want, or tell us what's kind of profducts you want? We will contact with you immediately, or we could recommend style to you.

Q3:Can you put your Design and logo on product?
A3:Yes, we have professional design service team, we can make any sample as your design, and also could put your logo on products.Moulds injection or leaser printing according your demand or your quantity.

Q4:What's the payment term?
A4:We can accept for L/C, T/T. Any other payment as your request.

Q5:Still have a lot of questions?
A5:Please feel free to contact with me as below name card,you can send email or add to your contacts and send me your question or inquiry ,welcome.

Physical Address

No.88 North Road,
浙江省余姚市河姆渡遺跡鎮

Work Hours

月曜日~金曜日:午前7時~午後7時
週末午前10時~午後5時

Phone Numbers

TEL: +86-15088499999
FAX: +86-15088499999

Please Contact Us

📞
電話
📞 電話連絡先
+8615088499999
クリックして電話をかける
✉️
電子メール
✉️ Eメール連絡先
zoefang97@gmail.com(ゾーイ・ファン)
sunj_china@hotmail.com(ジェヴィン・サン)
クリックしてメールを送信
WhatsApp
💬 WhatsApp
+8613989336302
クリックしてWhatsAppを開く
📱
スキャンする
スキャンしてお問い合わせ
WhatsApp QR

WhatsApp

微信QR

微信