
Butt Fusion Male Adapter
HDPE Butt Fusion Male Adapter for PE to Thread Transitions
Deskripsi Singkat
Heavy-Duty PE Male Thread Adapter with Butt Fusion Joint for Secure Pipeline Integration.
Intro Product Summary
The HDPE Butt Fusion Male Adapter is a transition fitting designed to connect HDPE pipelines with female-threaded valves, fittings, or metal components. Featuring a butt fusion welding end and a precision male thread, this adapter becomes a permanent part of the pipeline while providing a reliable threaded interface.
Fitur Utama
- High-Strength Butt Fusion Joint
Creates a fully homogeneous connection with the HDPE pipe, suitable for higher pressure systems. - Reliable PE-to-Thread Transition
Provides a stable interface between HDPE pipelines and threaded valves or fittings. - Precision Machined Male Thread
Ensures consistent engagement and sealing with standard female-thread components. - Excellent Pressure Performance
Designed for long-term operation under rated pressure conditions. - Corrosion & Chemical Resistance
HDPE material performs well in aggressive soil, water, and industrial environments.
Aplikasi
- Municipal potable water distribution systems
- Agricultural irrigation and pumping stations
- Industrial fluid transfer pipelines
- Low-pressure gas distribution networks
- Pipeline branches for valves and flow meters
- Service connections in residential and commercial projects
Mengapa Memilih Xinda Plastic Pipe Co, Ltd
- Lebih dari 24 tahun pengalaman manufaktur fitting HDPE.
- Lini produk lengkap: Seri Pemasangan Elektrofusi, Seri Pemasangan Transisi PE / Baja, Seri Sambungan Soket, Seri Pemasangan Fusi Pantat.
- Penyematan kawat tembaga presisi tinggi untuk kualitas pengelasan yang konsisten.
- Laboratorium QC internal memastikan setiap pemasangan diperiksa dan ditelusuri secara batch.
- Dukungan komprehensif untuk OEM dan pasokan proyek.
- Tim teknis memberikan panduan fusi dan dukungan proyek.
| Metode Pengepakan | Karton |
| Metode Perdagangan | EXW, FOB, CFR, CIF,DDU |
| Metode Pembayaran | T / T, L / C pada pandangan |
| Kemampuan Pasokan | 100000 Ton / Tahun |
| Sertifikat | ISO、CE、GB/EN12201、EN1555、KS |
| Waktu Pimpin Produksi | Biasanya sekitar 2 ~ 3 minggu untuk GP 20′, 3 ~ 4 Minggu untuk GP 40′. |
| Spesifikasi | Item Number |
| 20×1/2″M | XDRML-20/1/2″ |
| 25×3/4″M | XDRML-25/3/4″ |
| 32×1″M | XDRML-32/1″ |
| 40×1 ¼″M | XDRML-40/1¼″ |
| 50×1 ½″M | XDRML-50/1½″ |
| 63×2″M | XDRML-63/2" |
| 75×2 ½″M | XDRML-75/2½″ |
| 90×3″M | XDRML-90/3″ |
Q1:What is the difference between butt fusion and socket fusion male adapters?
A1:Butt fusion adapters are typically used for larger diameters and provide higher joint strength.
Q2:.Bagaimana cara membeli produk?
A2:Contact with us by email or by Trade Manager or wechat/whatsapp, and inform us all information what you want, or tell us what's kind of products you want? We will contact with you immediately, or we could recommend style to you.
Q3:Dapatkah Anda menempatkan Desain dan logo Anda pada produk?
A3:Yes, we have professional design service team, we can make any sample as your design, and also could put your logo on products.
Q4:Apa jangka waktu pembayarannya?
A4:Kami dapat menerima L / C, T / T. Pembayaran lain apa pun sebagai permintaan Anda.
Q5:Masih memiliki banyak pertanyaan?
A5:Jangan ragu untuk menghubungi saya seperti kartu nama di bawah ini, Anda dapat mengirim email atau menambahkan ke kontak Anda dan mengirimkan pertanyaan atau pertanyaan Anda, selamat datang.
Alamat Fisik
No.88 North Road,
Kota Situs Hemudu, Yuyao, Zhejiang
Jam Kerja
Senin hingga Jumat: 7 pagi - 7 malam
Akhir pekan: Pukul 10.00 - 17.00
Nomor Telepon
TEL: +86-15088499999
FAX: +86-15088499999






